Lean – (7+2) Wastes of not being lean

These are:

  1. Overproduction.
  2. Waiting Times.
  3. Transportation.
  4. Inappropriate Processing – Too much/not of value.
  5. Inventory – space (land, building, rent, rates, power, heat, security…), damage, equipment, stock control, time delay, degradation, theft, transport, cost of capital…
  6. Unnecessary Motion – Movement of operator or things.
  7. Defects and Rejects.
  8. Goods or services not meeting needs of costumer.
  9. Not using the intellect of the employees.



 

Next Topic:

Leave a Comment

Also interesting!

Standardized braking test – Vehicle and Brake System Data
Standardized braking test – Vehicle and Brake System Data

Vehicle Data Wheelbase 2754 mm Effective radius of tires 307 mm Centre of Gravity Height 565 mm Maximum speed 214 kph [Read More]

Standardized braking test – Discussion and Conclusions
Standardized braking test – Discussion and Conclusions

Difficulties During Testing Because there were different braking areas along the track, the conditions for each braking [Read More]

Standardized braking test – Brake Distribution
Standardized braking test – Brake Distribution

The following figure shows the Brake Distribution during the Test 1 and 2 at MIRA in the range 1.5 to 8MPa of Brake [Read More]

Standardized braking test – Tests
Standardized braking test – Tests

A vehicle which ABS and EBS could be disconnected and selective front/rear/all axles braking was used. The vehicle [Read More]

BMW Plug-in Hybrid Technology
BMW Plug-in Hybrid Technology

The best of both Worlds: BMW presents the new plug-in-hybrid-technology, built into the BMW Concept Active Tourer. For [Read More]